MET, centre de regroupement

 

The site originally suffered from low capacity. An area of 10,000 m² was consolidated by the installation of wick drains.

 

Our solution

The work involved:

  • the consolidation of part of the soil by the installation of wick drains;
  • the creation of dams in the treatment ponds;
  • the setting-up of a waterproofing system for the pond containing the polluted sludge;
  • the installation of a drainage blanket;
  • the creation of a network for collecting and removing the drainage water to two tailing ponds;
  • the creation of roads.

 