Technology

DEME continues to innovate, pioneer and inspire through a multi-year investment programme
Al Jarraf

Facts

construction year // 2011
dimensions
lenght o.a.101.57 m
breadth o.a.21.00 m
moulded depth5.0 m
draught maximum4,31 m
draught minimum3,80 m
dredging depth minimum
4,1 m
dredging depth maximum
30 m
inside discharge pipe Ø
850 mm
power
total installed12,860 kw

Similar equipment